Lead time for machined parts is not only machine time. It is the sum of quoting, material, programming, machining, finishing, checking and shipping. Knowing which step dominates helps you plan and shorten it.
What sets lead time
- Material availability: common grades and bar sizes are in stock locally; special alloys take longer.
- Programming and setups: new parts need CAM programming and fixtures; repeat orders reuse them.
- Machine time: number of features, setups and tight tolerances.
- Secondary processes: anodizing, heat treatment or wire EDM add their own queue time.
- Approvals: questions about the drawing, or a first-article approval, add round trips.
- Shipping: air express is fast; sea freight is cheaper for large volumes but slower.
How to shorten it
- Send a complete RFQ: model, drawing, material, finish, quantity and destination.
- Choose common material grades.
- Avoid unnecessary tight tolerances and special processes.
- Answer drawing questions quickly; time zones mean a one-day delay per round trip.
- Order repeat parts in planned batches so programs and fixtures are reused.
Lead time with Chi Xin
Lead time depends on the part, quantity and finishing, and we confirm it in every quotation.
Chi Xin Technology is a CNC machine shop in Nantun District, Taichung, Taiwan, founded in 2022. We run 5+ CNC machines — 4.5-axis CNC machining centers and CNC lathes — and mainly machine aluminum alloys and alloy steel, with a metal tolerance of 0.02 mm. We also offer wire EDM and surface finishing including anodizing, and we export to customers in Europe and North America.
Frequently asked questions
What is your lead time?
It depends on part complexity, quantity and finishing, and is confirmed in every quotation.
Is air or sea freight better for machined parts?
Air express suits small, urgent shipments; sea freight suits larger, regular volumes where cost matters more than time.